BEC completed the 132/11kV Technopark substation, adhering to DEWA standards. The project included design, supply, and testing of 132kV GIS (8 bays), 50MVA transformers, and 11kV switchgears. Auxiliary installations covered telecom, capacitor banks, HVAC, and 47 km of cable laying. The substation strengthens Dubai’s power distribution network, exemplifying BEC’s ability to execute large-scale, high-specification utility projects with precision and safety.
Jabel Ali Free Zone Authority (JAFZA)
UAE
Infrastructure

Construction of Duqm 400/132/33kV Grid Station

Construction of Mahout 400/33kV Grid Station