BEC Group delivered the 132kV Wadi Kabir-Muttrah-Al Falaj Grid Station on an EPC basis. The project included design, supply, construction, and testing of GIS substations, transformers, and cable connections. The interconnection between substations enhanced regional power reliability. BEC ensured seamless integration of control, telecommunication, and protection systems, establishing reliable grid performance across Oman’s network.