BEC managed civil and electrical works for Yiti’s 132/33kV grid station and associated transmission systems. The scope included design, engineering, manufacturing, erection, testing, and commissioning, along with modifications at Jahlout and Qaboos substations. With 200 skilled personnel, BEC completed the project efficiently, contributing to the Muscat region’s reliable power infrastructure and OETC’s ongoing modernisation efforts.