The Rustaq Grid Station and 400kV OHL line from Ibri to New Rustaq was delivered as a comprehensive EPC project, providing a new grid supply point to serve Rustaq Region and Strengthening the 132kV Network (132kV LILO) involving Muladah GS, Wadi Bani GS Old Rustaq GS as Remote End, and Associated 400kV Overhead line systems connecting Ibri IPP by addition of Two (2) 400 kV OHL feeder bays at Ibri IPP, significantly enhancing grid reliability, stability, and regional power security. Additionally two (2) 400 kV GIS bays at Ibri IPP 400 kVIPP were added to connect to GCCIA Network.