BEC Group constructed a 380-bed General Hospital at Sur, delivering full civil works and specialised MEP for clinical and accommodation blocks. The project included 12 air-cooled chillers, medical gases, nurse call, vacuum and compressed air systems, CSSD, laboratory fit-out, kitchen and laundry equipment, steam and heating systems, standby generators and UPS, and a 33kV primary substation. Comprehensive low-current systems, fire-fighting, water and waste water treatment, and medical waste handling were integrated. BEC’s healthcare delivery expertise ensured compliance with clinical standards and operational readiness.
Ministry of Health, Oman
Oman
Healthcare

Complete MEP systems installation for Royal Guard Technical College with modern utilities.

Complete MEP works for luxury hotel with centralized HVAC, plumbing, and power systems.
Design-build MEP and district cooling systems with 12,500 TR plant at Oman’s largest shopping mall.