BEC Group constructed the 240-bed New General Hospital at Ibra, delivering complete civil works and specialised MEP services for clinical and staff accommodation blocks. The project included 12 air-cooled chillers (150 TR each), medical gas systems, nurse call, vacuum and compressed air systems, kitchen and laundry equipment, incinerators, boilers, standby generators, and UPS systems. Low current systems, fire alarm, structured cabling, and operation theatre surgical panels were implemented. The project also comprised 15 km of incoming water supply piping and integrated STP and wastewater treatment facilities for hospital operations.
Ministry of Health
Oman
Healthcare

Complete MEP systems installation for Royal Guard Technical College with modern utilities.

Complete MEP works for luxury hotel with centralized HVAC, plumbing, and power systems.
Design-build MEP and district cooling systems with 12,500 TR plant at Oman’s largest shopping mall.