BEC Group completed mechanical, electrical, instrumentation, and HVAC installation works for the Salalah Power Project. The scope covered six GE PG6581B gas turbines, exhaust stacks, fuel and gas systems, compressed air systems, and fire protection. BEC also performed equipment relocation and commissioning assistance. The project enhanced Dhofar’s power generation capacity and reliability through precise technical delivery and robust plant systems integration.
Dhofar Power Company
Oman
Infrastructure

Design-build MEP and district cooling systems with 12,500 TR plant at Oman’s largest shopping mall.

MEI works for 585 MW Power & Desalination Plant at Sohar IWPP Phase-1.
Full MEP package for a five-star hospitality development based on a design-and-build concept.