BEC Group carried out mechanical, structural, and piping works for the Sur Power Station, including three 250 MW turbine generators, seawater intake, and auxiliary systems. The scope included construction of control buildings, substations, and water treatment units. The project reinforced Oman’s power generation capacity through precision engineering, robust civil works, and timely completion.
Phoenix Power Company SAOC
Oman
Infrastructure

MEI works for 585 MW Power & Desalination Plant at Sohar IWPP Phase-1.

Complete MEP systems installation for Royal Guard Technical College with modern utilities.
Design-build MEP and district cooling systems with 12,500 TR plant at Oman’s largest shopping mall.